top of page
City Lights

CASE STUDY

833 COLLINS STREET, MELBOURNE

Image by Alexis

Project Overview

 

Built with a heavy focus on energy efficiency, 833 Collins Street is recognised as a Green Star rated building and utilises best practice design throughout including a fully operational Tri Generation Plant. To further continue the building’s high energy efficiency standards, it was recommended that the operating plant be reviewed to ensure full optimisation. This review would not only maintain energy savings but would also provide the client with measurement and verification of the plant’s performance, detailed reporting, and plant diagnostics.

​

Airmaster deployed the award-winning plant optimisation solution, PlantPRO to be installed at this site to both optimise the operation of the central plant and to provide advanced measurement and reporting capabilities to the facility.

 

Although comparative operating data was predominately over the winter months, it was clear that a downward trend in energy consumption was forming with even more significant energy savings seen over Spring 2018

 

Find out more

Contact your local Airmaster branch for more details.

bottom of page